We are the only company in Austin, TX to handle all aspects of remodeling from design, to supply, to install.

CCF logo in SVG
Please make sure you are not using our custom header option and enabled theme builder setting. See here for more information: https://help.diviengine.com/article/155-using-divi-mobile-in-the-theme-builder

Navigating Our Kitchen Build Process

May 1, 2024 | Kitchen Remodeling

Experts in Remodeling Await You

$

Congratulations! You’ve completed the sales & planning phase, and now it’s time to watch your vision come to life during the build cycle.

Kitchen Installation Build Process

Let’s take a closer look at the four-week build process journey that awaits you once all the materials arrive at your doorstep.

Week 1: Kitchen Demolition

Transformation Begins

In the first week, our skilled team swings into action, initiating the transformation process by demolishing the existing kitchen. With precision and care, we remove old fixtures and prepare the canvas for your new design. 

Next, we install the meticulously crafted cabinets, laying the foundation for your dream space. Once the cabinets are installed, our countertop fabricators visit to template the countertops, ensuring a perfect fit for your kitchen layout.

Week 2: Behind-the-Scenes Planning / Countertop Fabrication

Patience is Key

During the second week, we enter a holding pattern as we eagerly await the installation of your kitchen countertops. While no physical work Onsite, occurs during this time, rest assured that behind the scenes, meticulous planning and coordination are underway to ensure a seamless transition to the next phase of your project. 

If a project requires new flooring then it will be installed in week 2. 

Our team will do offsite precision cutting and quality control during this week.

Custom Kitchens In Austin Tx
custom kitchens in austin tx

Week 3: Countertop Installation

Excitement fills the air as we enter the third week of the build cycle. With countertops cut and ready, our team springs into action, installing them with precision and care.  Most countertop projects only take one day to install. 

The following day, our skilled tile craftsmen start the backsplash. This installation will take up to 2 days and we will be meticulously tiling your backsplash and grouting to perfection.

Week 4: Finishing Touches

Finishing Touches

As we approach the final week of the build cycle, anticipation builds as we prepare to install the appliances that will bring your kitchen to life. From the garbage disposal, and dishwasher to the oven, our team handles each installation with precision and attention to detail. 

We install all the kitchen hardware during this week

Additionally, we address any touch-ups necessary, ensuring that every aspect of your new space is flawless. From adjusting doors and drawers to conducting paint touch-ups and drywall repairs, we leave no stone unturned in delivering a space that exceeds your expectations.

Payment and Completion

At Cabinets Countertops Flooring, transparency is paramount. We require 100% payment for materials upfront and 50% of the labor costs at the beginning of the project, with the remaining 50% due upon completion. Depending on the size of the project, we may offer percentage completion draws to ensure fairness and transparency throughout the process. 

Our detailed estimates and invoices outline every line item, ensuring that no detail is overlooked. In the event of any changes in scope, rest assured that our team is equipped to handle adjustments seamlessly, ensuring that your project stays on track and on budget.

Schedule a Showroom Appointment

As you embark on this exciting journey with Cabinets Countertops Flooring, know that you’re in capable hands every step of the way. From concept to completion in your kitchen or bathroom remodel, we’re committed to bringing your vision to life with passion, professionalism, and unparalleled craftsmanship.

Request Consultation

We handle all aspects of remodeling from design, to supply, to install.

Get in touch with our team today to discuss your consultation for cabinets, countertops and flooring.

Call CCF for Custom Solutions

Ready to elevate your home with bespoke cabinetry, luxurious countertops, and durable flooring? Cabinets, Countertops, and Flooring is here to turn your vision into reality, ensuring a seamless remodel from start to finish. Click the button below to begin your transformation journey with us today.

Related Posts

Top Trends in Kitchen Shaker Cabinets

Top Trends in Kitchen Shaker Cabinets

Consider choosing Shaker cabinets for your kitchen when updating or designing your space. Known for their classic simplicity and timeless charm, these cabinets offer a versatile style that works well with various kitchen aesthetics. This article explores the...

Best Kitchen Cabinet Installers in Texas

Best Kitchen Cabinet Installers in Texas

Roadmap to Finding Kitchen Cabinet Installers in Texas Are you looking for the perfect kitchen cabinet installer in Texas? Here's a roadmap to help you find one: Installing new kitchen cabinets can significantly boost the value of your home and enhance its aesthetic...

How Much Does a Kitchen Remodel Increase Home Value?

How Much Does a Kitchen Remodel Increase Home Value?

When it comes to home renovations, few projects offer the same potential return on investment (ROI) as a well-executed kitchen remodeling. As the only kitchen remodeler in Austin, Cabinets, Countertops, Flooring handles every aspect of the project so we can give you...

Create Your Dream Home

Full-Service Cabinets, Countertops & Flooring

At Cabinets, Countertops, Flooring, your vision is our blueprint. Whether you're revamping your kitchen or bathroom, we offer custom solutions in cabinets, countertops, and flooring. We're the only true full-service kitchen remodeler in Austin, TX, from idea to installation. Get in contact to start your project with our team!